Deferred submittals

City of hillsboro - building department deferred submittals procedures for the deferred submittal• a complete list of submittals to be deferred is required at the time of the building permit application.• a statement of design criteria and... City of hillsboro - building department deferred submittals procedures for the deferred submittal • a complete list of submittals...

Sample submittal form

... location/ date sampled: tests to be run (please circle): particle size analysis gravel gradation infiltration rate usga performance evaluation bunker sand evaluation water release characterization sand cap evaluation organic matter soil texture... Sample submittal form march 2010 sample(s) submitted by (company, person): project name: testing information sample name/description (s) (e.g....

Department submittals to the ctc

Project delivery hq division chiefs, et. al april 2, 2009 page 2"caltrans improves mobility across california" environmental documentation for projects is to be sent to the ctc whenever the project requires the ctc to program and allocate funds, approve a route adoption or approve a new road connection. the responsibility to coordinate and submit... Apr 02, 2009 · relationship and sequence between ceqa and formal ctc submittal the order and timing of environmental documentation submittals is...

Construction submittal and shop drawing liability

Copyright © 2007 submittal exchange, llc page 1 of 7 construction submittal and shop drawing liabilityé risks arising out of the submittal processé how submittals by e-mail can increase riské the submittal exchange ™ system as a tool for... Copyright © 2007 submittal exchange, llc page 1 of 7 construction submittal and shop drawing liability é risks arising out of the submittal process é how...

Project submittal requirements

January 2011 land development manual volume i, chapter 1 project submittal requirements section 4 development permits/approvals development services department 1222 first avenue, ms 301, san diego, ca 92101-4101 call (619) 446-5300 for appointments... January 2011 land development manual volume i, chapter 1 project submittal requirements section 4 development permits/approvals...

On demand water heater

... designation schedule # odw specification heat input (btu/h) 199,000 btu/h modulation range (btu/h) 26,000-199,000 btuh energy factor (%) 092 energy factor (%) 0.92 dhw temperature (degf) 98 to 158 degf operating pressure (psi) 15 - 145 psig submittal odw-199 a on demand water heater job name location purchaser engineer submitted to reference approval construction submitted to reference...

Dual purpose water heater

... system data dpw-199a heat input (btu/h) 26,000 - 199,000 afue (%) 90 htg water temp (degf) 122 to 176 degf working pressure (psi) 15 - 20 freeze protection device thermistor heating min flow (gpm) 1.2 htg heat exch water volume (gal) 0.25 submittal dpw-199 a dual purpose water heater job name location purchaser engineer submitted to reference approval construction unit desi gnation...

Elite heating boiler submittal

... exchanger• all stainless steel construction 160 psi asme stamped construction national board listed• gasket less heat exchanger design• psi relief valve• front service access to combustion chamber and burner• inlet and outlet... Elite heating boiler submittal job name : location: arch./ engr: wholesaler : mech. contractor: model number: type of gas: btu/hr input low fire: btu/hr input high...

Project id: originator: subcontract : project name: item ...

... information certified data resubmittal as specified exception qty. drawing / specification and section reference description of item name signature date forwarded to submittal form project id: originator: subcontract : project name: item # transmittal # for approval for...

Example leed -nc v2.1 energy & atmosphere credit 1 submittal

... provides an example submittal for the leed-nc v2.1 energy & atmosphere credit 1 (eac1). this sample eac1 submittal includes the following elements: 1. signed leed letter template (pg 2). Example leed-nc v2.1 eac1 submittal pg 1 november 2004 example leed -nc v2.1 energy & atmosphere credit 1 submittal november 2004 the following...

Design submittal procedures 11/07

Section 01 33 10.05 20 design submittal procedures 11/07 1.4 submittals submit design submittals, including shop drawings used as design drawings, to the government for approval. the use of a "g" following a submittal indicates that a government... Section 01 33 10.05 20 design submittal procedures 11/07 1.4 submittals submit design submittals, including shop drawings used as design...

Construction specifications institute substitution request form

... following product as approved equal to or substitution for the speci*ed item on the above project. design hardware | 211 endeavor drive p.o. box 680 | rogersville, mo 65742 phone: 877-258-1262 | fax: 877-888-0150 | www.designhardware.net section paragraph specified item proposed substitution section paragraph specified item proposed... Construction specifications institute substitution request form to: project architect: project name: project location: date: bid date: we...

Equipment submittal for approval

Equipment submittal for approval project: syracuse vamc chiller replacement project location: syracuse, new york york yk millennium™ centrifugal chiller equipment yk max e chiller unit tags ch-1 & 2 quantity 2 proposal reference va-528-10... Equipment submittal for approval project: syracuse vamc chiller replacement project location: syracuse, new york york yk millennium™...

submittal sheet

Inc. submittal sheet product(s): trim-tex rigid vinyl drywall beads job name contractordate approvals (signatures or stamps) description: advantages: limitations: Inc. submittal sheet product(s): trim-tex rigid vinyl drywall beads job name contractordate...

Online software for managing construction documents upgrades ...

... construction communicator™ software ( www.construction communicator.com ) make it easier for architects and contractors to track submittals and resubmittals. construction communicator helps owners, contractors and architects manage contract For immediate release online software for managing construction documents upgrades submittal process fremont, california, january 10, 2007...

submittal data: msz-fd09na & muz-fd09na

... unit: muz-fd09na indoor unit mca … 1 a fan motor … 0.76 f.l.a. airflow cooling (lo - med - hi - powerful) … 162 - 226 - 339 - 381 dry cfm 144 - 202 - 307 - 343... Job name: location: date: purchaser: engineer: submitted to: for reference approval construction unit designation: schedule no.: indoor unit: msz-fd09na...

Fire extinguisher submittal

... reaction on class b fires, fuses and insulates class a fires and is a non-conductor of electricity. non-toxic. operation: squeeze the lever, which opens the valve, allowing the chemical to be forced out. upright squeeze grip operation approved... Cosmic extinguishers - multi purpose chemical these units contain specially fluidized and siliconized mono ammonium phosphate powder, which...

Ufgs 01 33 00 submittal procedures

... superseding ufgs-01 33 00 (february 2011) unified facilities guide specifications***** section 01 33 00 submittal procedures 05/11*** *****usace / navfac / afcesa / nasa ufgs-01 33 00 (may 2011) -preparing activity: nasa...

submittal transmittal form

... s comments contractor's submittal transmittal lantdiv norfolk 4-4355/3 (rev. 11-99) contractor use only reviewer use only **action codes a - approved d - disapproved an - approved as noted ra - receipt acknowledged Contract number transmittal number date from contractor project title and location to contractor approved government approved variation for government approval...